ClickHouse Cloud offers different release channels to cater to different user needs regarding stability, access to new features, and upgrade predictability. Each channel has a distinct upgrade schedule and is meant to address the different usecases - for users that want instant access to new releases and those that want to defer upgrades to ensure they receive the most stable version of the release.

Release channel details

Learn more about release channels
Channel NameDescriptionKey ConsiderationsTiers Supported
Fast (Early Release)Recommended for non production environments. This is the first release channel for every database version upgradeNew feature access over stability.
Ability to test releases in non production environments ahead of production upgrade
Basic (default)
Scale, Enterprise tiers
RegularDefault release channel for all multi replica services.
Rollout on this channel typically begins two weeks after the Fast release channel starts.
Default/ fleetwide upgrades.
Services are upgraded gradually over multiple weeks
Scale and Enterprise
Slow (Deferred)Recommended for those more risk averse users that want their services to be upgraded towards the end of the release schedule.
Rollout on this channel typically begins two weeks after the Regular release channel starts.
Maximum stability and predictability.
Meant for those that need more testing of new releases on either the Fast/Regular channel
Enterprise


Note

All single replica services are automatically enrolled in the Fast release channel.

Scheduled upgrade windows are available for all release channels for services in the Enterprise tier. This feature allows you to configure a time window on a given day of the week for upgrades.

Release schedule

Understanding release dates

The dates shown below indicate when ClickHouse begins the rollout to each release channel, not when your individual service will be upgraded.

  • Rollouts are automated and occur gradually over multiple weeks
  • Services with configured scheduled upgrade windows are upgraded during their scheduled window in the week after the channel rollout ends
  • Rollout completion may be delayed due to rollout pauses (e.g., holiday freezes) or health monitoring

For advance testing before production upgrades, use the Fast or Regular channel for non-production services and the Slow channel for production services.

VersionFast ChannelRegular ChannelSlow Channel
Rollout StartRollout EndRollout StartRollout EndRollout StartRollout End
25.10
2025-12-11
2025-12-15
2026-01-23
iServices with scheduled upgrade windows will receive 25.10 during their scheduled window in the week after rollout completes
TBD
TBD
TBD
25.8
Completed
Completed
2025-10-29
2025-12-19
2026-01-27
2026-02-04